 ##  [Last Planner System](/last-planner-system) 

  ##  [Last Planner System](https://engineering.quantumdictionary.io/last-planner-system-0) 

  

 [![Engineering & Applied Technologies Dictionary](/sites/default/files/styles/large/public/2026-01/Engineering%20%26%20Applied%20Technologies.png.webp?itok=_IKO7_-n)](/topic-specific-dictionaries/engineering-applied-technologies)



**Engineering &amp; Applied Technologies Dictionary**

 







 

 

 

 



 

 

 

 

Definition

A production planning and control model for construction that organizes short‑term work by obtaining collaborative, time‑bound commitments from trade teams, using pull‑style lookahead planning to identify sequenceable tasks and remove constraints, and measuring commitment reliability so as to increase workflow predictability and reduce rework.